Riyadh HQ
LOC-001
- Root Level -
1
King Fahd Road, Al Olaya District
Riyadh 12211, Saudi Arabia
CC-RIYADH-001
2024-01-15 10:30 AM
by Admin User
2024-12-20 14:45 PM
by System Admin
Spatial Location
Map View
Interactive map with location marker
Assets at This Location
| Asset Name | Category | Status | Criticality | Actions |
|---|---|---|---|---|
|
Main HVAC Unit 01
ASSET-44219
|
HVAC / Cooling | Active | Safety Critical | |
|
Emergency Generator A
ASSET-55301
|
Electrical / Power | In Repair | High | |
|
IT Server Rack 04
ASSET-10228
|
IT Infrastructure | Active | Medium |
Users with Access
John Smith
Maintenance Technician • Riyadh HQ
Sarah Ahmed
Senior Technician • Riyadh HQ
Active Work Orders
Repair main elevator light fixture
Reported flickering and complete failure of the south-facing light panel in Elevator 02.
Monthly HVAC filter replacement
Recurring PM for standard filter replacement across all main floor AHUs.
Location Activated
StatusLocation status changed to active by System Admin.
Details Updated
Address and timezone information updated by Admin User.
Location Created
Location initialized by System Admin.